For an unventilated roof without the use of counter battens a gap would need to be left for the breathable membrane to drape.
Pitched roof air gap.
Ventilated roofs require a 50 mm air gap above the insulation timber stop battens can be nailed into the side of the rafters to give the correct air gap when.
At the ridge and also at the bottom either through vents at the eaves or.
If 180mm is to be installed then 100mm board might be introduced between the rafters there has to be a minimum 25mm air gap between the insulation and the underside of.
This gap must be ventilated at the top i e.
Kingspan with a warm roof the usual process is to split the insulation into two layers.
There will also be kooltherm k7 pitched roof board between the rafters image credit.
It is important that air is allowed to circulate between the roof covering and the insulation to avoid condensation a gap of at least 50mm 2 inch must be left between the insulation and the inside of the roof covering.
Find out about insulating a pitched roof at rafter level and the number of key design considerations which will affect the build up of the roof and the choice of insulation.
The map at right which is based on table r806 4 of the irc lists the minimum r values required to prevent condensation in unvented assemblies in various climate zones.
An unvented roof assembly is possible only if you keep the roof sheathing warm enough to prevent conditioned air from condensing against it.